0% platform fee for SadakaNow projects.
SadakaNow
Sign inStart your project
← Back to the blog
Donate water well

Donate a water well: 7 projects with costs and impact

15 min read

A well for 50 euros: what actually ends up being delivered. You donate a share of a well and later want to know where the money was used. Do you get a photo, a specific location, or a report on construction and maintenance? Or does it stay at a general confirmation? With water projects, it's not just the amounts that differ, but also the evidence donors can expect.

This comparison looks at seven offers for donating water wells. The focus is not on the most emotional campaign or the lowest entry price, but on the practical question: What can be clarified before payment regarding allocation, location, construction time and documentation? Even an announced report is no substitute for ongoing quality controls and a plan for repairs. Safe drinking water does not depend solely on a well being built: The Bundesministerium für wirtschaftliche Zusammenarbeit und Entwicklung describes safe supply as constant access to hygienically sound water on site, free of contamination.

Table of contents

1. SadakaNow for water projects

SadakaNow bundles donation options for clean water in its own category. The platform is suitable for donors who want to compare projects from vetted organisations and rely on the available project information and progress indicators. However, a specific campaign for building a water well could not be confirmed. Before paying, therefore check whether a project is actually currently being offered that finances the construction of a well.

SadakaNow, Wasserprojekte

What the platform documents

SadakaNow states a 0% platform fee. According to the platform, voluntary tips support the financing of its operations; donations are processed via SEPA, PayPal or credit card. All campaigns are checked for charitable status before being activated. Project information and progress indicators can improve traceability, but they do not replace details about a specific well if no such campaign is available.

For your decision, the difference between platform transparency and project evidence therefore matters. The platform can provide information on campaigns and progress. Whether a particular contribution is allocated to a particular well, and whether you will later receive photos or location details, must be evident from the information on the respective project. Also check who carries out the construction work and who is responsible for maintenance and water quality after completion.

Practical rule: Only pay for a specific well once the current project clearly describes this allocation and the expected evidence.

Those interested in the longer-term significance of regular or ongoing donations will also find an explanation of the meaning of Sadaqa Jariyah at SadakaNow. As an entry point to the platform, the Water Projects category at SadakaNow offers an overview of the available offers. The decisive caveat remains: availability does not mean a well commitment. If the project description and the desired purpose do not match, you should choose a different campaign or not treat the water project donation as an individual well construction.

2. ILA Europe e.V. for various well models

At ILA Europe, donors can finance a partial amount or an entire well, depending on the available project. The organisation offers projects in several African countries and Pakistan. This is helpful if you don't necessarily want to specify a particular location but want to choose between different forms of participation.

ILA Europe e.V.

Which documentation is provided

For suitable projects, contributions starting from 100 euros, 1,000 euros, and more are possible. Depending on the level of participation, donors may request a dedication and a name plaque. Photos and location information are provided after completion. For community wells, an opening video may also be included. Information on soil analysis, construction method, and process helps assess not only the completion but also the technical implementation.

The downside is the variable planning: the exact region depends on need and feasibility. A construction time of just a few weeks therefore cannot be assumed for every project. Depending on the country and type of well, implementation can also take several months; prices and available options may also change. Before donating, have it confirmed whether the displayed amount applies to a specific project or only enables participation.

Clarify before payment: Does “location information” mean a specific place name, and when after completion will you receive photos and, if applicable, the video?

Those who choose a well share should also ask whether this share is documented individually or goes into shared financing. For donors who care most about a traceable completion, the announced photos and location information are a useful starting point. However, they do not automatically answer how water quality is checked or who repairs the well later. The project page of ILA Europe should therefore be checked before payment for current prices, construction type, and reporting format.

3. HASENE International e.V. with funds, wells, and Schadirwan

HASENE distinguishes between classic wells and larger Schadirwan facilities with multiple taps, which can be used, for example, at mosques or other heavily frequented locations. Those who want to fund more than a simple well will find a different project scale here. What matters is that the chosen form of donation also matches the desired documentation.

HASENE International e.V.

Fund contribution or specific participation

According to the donation overview, contributions to a water well fund can start from 20 euros; partial participation in specific projects starts at 1,000 euros. With suitable participation, a dedication and a project plaque are possible. For certain projects, a folder with photos and information is provided after completion. HASENE also states a two-year guarantee for wells and a three-year guarantee for Schadirwan projects. This information is useful, but should not be confused with a complete maintenance plan: ask what defects the guarantee covers and how repairs are organised on site.

Smaller contributions to a fund are not automatically assigned to an individually documented well. If a specific location matters to you, you should clarify in advance whether the chosen participation actually supports a specific construction project. The stated completion times may also differ on the website. Therefore, do not rely on a single time indication without matching it to the specific project.

  • Fund contribution: suitable if you want to support water projects in general.
  • Project participation: more sensible if you expect a dedication, project folder, or a specific assignment.
  • Guarantee: ask about scope, start date, and procedure in case of a defect.

The process may include a form, a confirmation, and then a payment. Allow time for this and check before the transfer which amount and which project variant have been confirmed. The water projects of HASENE provide the basis for comparison; what is binding for your donation is the information on the selected offer.

4. Humanity First Deutschland with a focus on repairs

A new build is not the only way to improve access to water. In the „Water for Life“ programme, Humanity First Deutschland supports both new wells and the rehabilitation of defective hand pumps. The regions mentioned are Benin, Togo, and Tharparkar in Pakistan. Those who specifically want to make an existing water point functional again should include this repair option in their selection.

Humanity First Deutschland

Reference values are not an individual well commitment

Humanity First cites around 750 euros as a guideline figure for rehabilitating a hand pump and an average of around 2,500 euros for a new well. These amounts help with orientation but do not guarantee that your donation will be allocated to a specific well at a clearly designated location. You should therefore ask whether the payment goes into a regional project budget or finances a specific undertaking.

The repair option is technically relevant: a restored pump can secure an existing water supply instead of exclusively financing new infrastructure. For the sake of traceability, you should still not only ask about the repair. What matters is whether the pump actually works after completion, who procures spare parts, and who intervenes if it breaks down again. A guideline figure says nothing about these operational questions.

A pump reported as finished is only a convincing project record once its continued functionality also remains traceable.

The project page does not guarantee individual locations or standardized photo reports for every donation. A choice of different well models is also less of a focus than the support of new builds and repairs. Donations are possible via the online page or by bank transfer; a donation receipt can be requested. The "Water for Life" programme page of Humanity First Deutschland is a good starting point, but anyone who needs individual evidence should clarify the allocation and reporting format in advance.

5. Islamic Relief Deutschland with rotating well offers

Islamic Relief Deutschland occasionally offers individual well projects. According to the FAQ, an offer was available in Sylhet, Bangladesh; however, target countries and projects can change. Anyone set on a particular location should therefore check the current project description before donating, rather than relying on a previous offer.

Report and alternative when no individual project is available

According to the organisation, once a well project is completed, donors receive a detailed report with photos as well as a certificate of thanks. This is a clearly specified form of documentation. Even so, you should ask whether the report includes the specific location, the construction period, and information on maintenance. A photo proves construction progress, but on its own neither the lasting function nor the quality of the water.

If no individual well project is currently on offer, a general donation for water projects may be an option. This is a suitable alternative if supporting the topic area matters more to you than an individually assigned construction project. According to the FAQ, partial financing or instalment payments for an individual well project are not possible. The price depends on whichever offer is currently available. Islamic Relief also states that it does not finance wells from Zakat. Anyone who needs to take the religious designation of a donation into account should factor this note into their decision.

Implementation takes place through the organisation's international presence as well as local staff or offices. This can be relevant to on-the-ground delivery, but it does not replace checking the specific project documentation. The FAQ mentions secure transmission of online donations via an SSL connection, but says nothing about a fixed construction period. You should therefore check both the currently available projects and the expected completion documents before making a payment.

Anyone wanting to compare Islamic aid organisations using other criteria can find an overview of Muslim aid organisations at SadakaNow. For deciding on a well, the current project page of Islamic Relief Deutschland remains authoritative. In doing so, do not treat a general water project donation as if it were automatically assigned to a single well.

6. Al-Ishraaq e.V. with local involvement

Al-Ishraaq e.V. describes a well-building project focused on Somalia. The association states that it selects areas together with partners on the ground and employs local skilled workers. The village community is also meant to be involved in upkeep and maintenance. This involvement is an important aspect, because a water point continues to need operators and repair options after construction.

Al-Ishraaq e.V.

Progress is not the same as a final report

The online donation process is meant to make it possible to track project progress. However, the project page does not list fixed well prices. In addition, some publicly visible result figures refer to 2023. You should therefore ask which information applies to a current undertaking and whether you will receive individual proof after completion.

The information on area selection and local involvement describes the approach, but not automatically the later documentation. Individual photos, GPS coordinates, and a specific form of final report are not explicitly guaranteed on the page reviewed. If you need this kind of evidence, clarify before paying whether the association will provide it for the specific project. For an unspecified donation amount, it is also important to understand how the association allocates the funds to a project or purpose.

What matters for impact is not just whether local skilled workers build the well. A viable plan should also specify who takes on the maintenance, how spare parts can be obtained, and how water quality is tested. This is especially true when the village community is given a central role: their involvement should come with clear responsibilities and practical options for repairs.

The project page on well construction by Al-Ishraaq is the right place to check the current project status. If you donate, keep your questions about costs, location, and proof of completion as specific as possible. An organisation can organise the construction sensibly even if it does not offer an individual photo report for every donation. This limitation should be clear before payment.

7. Global Relief Organization e.V. with clear amounts

Global Relief Organization e.V. lists three participation amounts: 50 euros for a share in a well, 250 euros for a small well, and 1,500 euros for a deep well with a pump. The amounts give an orientation regarding the models offered. Before paying, clarify whether a share is bundled with other donations and what construction work the respective amount covers.

Global Relief Organization e.V.

Verify details before the transfer

Global Relief promises photo and video proof after implementation. Ask whether these show the location, when they will be provided, and whether they document your contribution or the overall project. Information on construction time and project region is limited; therefore, no completion date can be derived from the amounts alone.

Online donations may be temporarily unavailable. In this case, Global Relief names a bank transfer with the reference "Wasserbrunnen" as an alternative. Before transferring, check the current payment details and have it confirmed that the money will be allocated to the desired project. The reference alone does not guarantee individual allocation or a specific well.

A share in a well is suitable if you want to support a jointly financed facility. For a small well or a deep well, you should clarify in advance which work the amount covers and who takes care of maintenance and repairs after construction.

The water well project page by Global Relief contains the information you should check for up-to-dateness before payment. Pay particular attention to the allocation of your donation and to which location and completion proofs are promised for the chosen model.

Benchmarks, proof, and project regions of the seven providers at a glance

Provider Stated amount Project region Proof after implementation
SadakaNow, water projects No specific donation amount stated Not specifically stated Project information and progress updates
ILA Europe e.V. From 100 €, 1,000 € and several thousand euros Several African countries and Pakistan Photos and location details; video possible for community wells
HASENE International e.V. Water well fund from 20 €, partial shares from 1,000 € Not specifically stated Project folder with photos and information
Humanity First Deutschland Approx. 750 € for hand pump rehabilitation; approx. 2,500 € for a new well Benin, Togo, and Tharparkar in Pakistan No standardised photo reports guaranteed
Islamic Relief Deutschland No fixed price; depends on the respective project Sylhet, Bangladesh (according to FAQ); target countries change Detailed report with photos and certificate of thanks
Al-Ishraaq e.V. No fixed well prices stated Focus on Somalia Progress can be tracked online; individual proof not explicitly guaranteed
Global Relief Organization e.V. 50 € well share; 250 € small well; 1,500 € deep well with pump Not specifically stated Photo and video proof announced

Donating purposefully: these checkpoints matter before payment

Compare providers not only by the amount, but by allocation, proof, construction time, and guarantee. Ask whether your payment finances a specific well, flows into a regional fund, or represents a share in a community project. This distinction determines which location information and which individual documentation you can realistically expect.

A photo is evidence of visible construction progress, but not proof of permanently available, hygienically safe water. The BMZ distinguishes between mere access to a source and a safely managed drinking water supply that provides hygienically safe water without contamination at all times. Therefore, ask not only about completion, but also about water analyses, retesting, treatment, and responsibilities in case of contamination. According to the BMZ, basic supply also requires that the safe water source be no more than 30 minutes away for the round trip.

The long-term function is also part of the assessment. A case study by the University of Duisburg-Essen on a project in Chad documented that three years after the project ended, more than 95% of the hand pumps were operational; the project indicator had provided for 75%. The case study by the University of Duisburg-Essen shows why a donation campaign should report not only the number of wells built, but also maintenance, spare parts, and later function checks. The result cannot be generalised to other projects, but it offers a useful benchmark: how is functionality checked after handover?

Before making a transfer, ask about the specific location, the expected completion date, and the form of the final report. Also clarify who organises and finances repairs. A warranty is helpful if the duration and covered damages are clearly described. Where information is missing, you should not mistake this uncertainty for a general assurance.

Anyone wishing to specifically fund drinking water will find a category for water projects on SadakaNow and can review the available project information themselves before donating. All campaigns are checked for charitable status before being activated. However, whether a specific well is available and which evidence the respective organisation provides after implementation depends on the selected project.


SadakaNow brings together water projects of verified organisations on a German donation platform with 0% platform fee; voluntary tips support the platform's operation. Review the available project details and choose an offer whose allocation and evidence match your donation goal, on SadakaNow.

Turn knowledge into impact

Discover projects you can support directly and transparently today.

Discover projects